As reported by Bolesławiec City Hall:
Construction of Powstańców Warszawy Street is nearing completion. As part of the investment, a 424-metre asphalt road with a 354-metre shared pedestrian and cycle path has been built.
It adds: – The investment includes, among other things, edging the carriageway with a kerb and gutter, connecting the carriageway to the existing driveways, adjusting sanitary sewer manholes, street inlets and water supply valves.
Fifteen LED streetlights with an intelligent lighting management system have also been installed on the street.