The project was carried out by a consortium comprising Zakład Remontowo-Budowlany „Dragon” from Łeba (leader) and Konstruktor Group from Wrocław. The investment cost more than PLN 6 million. The funds came from the budget of the City of Bolesławiec.
Municipal officials:
The new facility is intended for 150 children. The kindergarten building includes six groups, each with a complete sanitary unit, a meal distribution room, a small gymnasium, a children’s cloakroom, a sensory room, and administrative and technical facilities.
The building was also designed to be energy-efficient and accessible to people with disabilities. The facility is equipped with, among other things:
- low-temperature underfloor heating,
- heat pumps,
- mechanical ventilation with heat recovery,
- a photovoltaic installation,
- triple-glazed windows,
- a rainwater tank.
As part of the project, parking spaces, pavements, a service yard and fencing were constructed. The property includes a playground with safe surfaces and a recreational area naturally shaded by existing trees. The grounds are lit and monitored.
The office adds:
The next stage is to fully equip the facility with furniture, the necessary equipment for educational activities and various play accessories for preschoolers.