The design documentation concerns roads on the following streets:

  • Gdańska 58–66
  • Powstańców Warszawy
  • Orląt Lwowskich
  • Majora „Hubala”
  • Grabowa
  • Morelowa
  • Obrońców Helu (parking)
  • Nadrzeczna.

The design documentation currently being prepared includes the construction of an access ramp for wheelchairs and bicycles next to the stairs on Piaskowa Street. Another document concerns the renovation of the roadway and parking areas on Łukasiewicza Street. The renovation includes replacing the roadway and sidewalk surfaces, adjusting manholes and valves, replacing storm-drain inlets, and installing horizontal and vertical road markings.

The expansion of the car park on Konstytucji 3 Maja Street and the construction of a road on Zabobrze are also currently being designed. Work on the documentation will continue until the end of October this year.