Residents of Widok Street in Bolesławiec had been reporting the road’s poor condition for many years. We described the issue on the istotne.pl portal, including in 2016.

As the municipal office reports:

The project includes the construction of a road approximately 212 m long. It provides for an asphalt roadway bordered by a kerb with a kerbside gutter, as well as the surfacing of individual access roads and walkways leading to private properties. The project also includes the installation of stormwater drainage inlets connected to the existing drainage system, along with a pedestrian and cycling path with a black bituminous surface.

The city plans to allocate PLN 1,200,000 for the reconstruction of Widok Street.