A visualization of the new Water and Sports Centre in Bolesławiec was presented during the city council’s budget session, held on 28 December.

Construction of the family water park is currently under way.

See a visualization of the entire facility:

Continuation of the project. Stage I includes the construction of:

  • an outdoor pool zone with four pools (a recreation zone with a brine graduation tower; zones for children aged 1–4, 4–7 and over 7),
  • a complex of two family water slides,
  • recreational “green” beaches and terraces, a playground, a multifunctional building with changing rooms and ticket offices,
  • a restaurant and publicly accessible car parks for approximately 250 vehicles.

Completion date for Stage I: 31 May 2024.

The planned Stage II works include developing the site through:

  • the construction of three slides (100 m, 75 m and 45 m),
  • the expansion of the football-pitch zone with changing-room and storage facilities (a covered, year-round training hall, a natural-surface pitch, a covered artificial-surface pitch, a storage building and technical buildings),
  • the creation of a grass-beach zone and accompanying small-scale architecture (grass beaches, a dry playground, a beach-volleyball court and a multifunctional court).
  • three beach-football courts,
  • a multifunctional court. The existing recreation zone, which includes an amphitheatre, two tennis courts and a barbecue shelter, is planned to be expanded with an event shelter with changing-room and social facilities, a food-truck area and an area for portable toilets.

Completion date for Stage II: 31 June 2025.