The scope of the investment on Majora Hubala Street includes the construction of a 113.60 m road together with lighting and drainage. As part of the work, a roadway with a bituminous surface, a bicycle path with a red asphalt surface, concrete-paver driveways, sidewalks and access paths to properties, and sewer manholes were built.

The street is illuminated by four streetlights with LED fixtures. The contractor is “JAGIELSKI” from Bolesławice near Bolesławiec. The total cost of the project is PLN 913,782. The investment was financed from the budget of the City of Bolesławiec.

A road with side branches, measuring 341.90 m in total, has been built on Orląt Lwowskich Street, together with lighting and drainage. The project includes the construction of a roadway with a bituminous surface, concrete-paver driveways, raised pedestrian crossings, sidewalks and access paths to properties, as well as sewer manholes. Fourteen streetlights with LED fixtures have been installed on the street.

The contractor is “JAGIELSKI” from Bolesławice near Bolesławiec. The total cost of the project is PLN 2,037,739. The funds come from the budget of the City of Bolesławiec.