The works included, among other things, construction of a section of an internal road with an asphalt surface and construction of a paved-block sidewalk. As part of the works, an access road from Kwiatowa Street, a stormwater drainage system, and a retaining wall with a safety railing were built. The streets are lit by six street lamps. The works were carried out by the “Rob-Bud” company from Brzeźnik near Bolesławiec. The value of the completed works was PLN 504,549.

In October, partial repairs of roadways and sidewalks were carried out on the following streets: Kleeberga, Karpecka, Daszyńskiego, Śniadeckich, and Orla. Dangerous areas were secured on Piaskowa Street and Śniadeckich Street. Road sign repairs were carried out on the following streets: Tysiąclecia, Spokojna, Starzyńskiego, Kleeberga, Kilińskiego, Kościelna, Łukasiewicza, Słowackiego, Bielska, Warszawska, Narutowicza, Hutnicza, and Piłsudskiego. Signage was supplemented on Spokojna Street.

On 4 November 2015, Bolesławiec City Hall handed over the construction site for the installation of city monitoring at a multi-generational playground in the park on Parkowa Street. The works involve expanding the existing city monitoring system with four camera points. The contractor is Alphatec Communication from Jelenia Góra. The value of the project is PLN 200,996.

Plac zabawPlac zabaw • Photo author: UM Bolesławiec

On 2 November, the construction site was handed over for the reconstruction of the internal road to the Regional Road Traffic Centre at 71a Lubańska Street in Bolesławiec. The investment includes construction of a roadway surface made of concrete paving blocks, construction of a stormwater drainage system, and construction of street lighting. The contractor is SKG from Bożejowice near Bolesławiec. The city budget allocated PLN 165,036 for this purpose. Construction works will continue until the end of January 2016.

iza