As she points out, they are connected with the ongoing construction of a new bridge and the changes introduced to traffic organization. According to the resident, the situation is causing delays to Miejski Zakład Komunikacji buses in Bolesławiec, which may be as long as 25–30 minutes.
– Many passengers do not know what is causing them (the delays) and direct their complaints at the drivers, who have no influence over this whatsoever. Such information could help passengers understand the situation and reduce unnecessary stress – the reader emphasizes.
We contacted MZK Bolesławiec for comment on the matter. The carrier confirms that delays are occurring and points out that they are caused by traffic disruptions in the area of the bridge on ul. Zgorzelecka and ul. Widok.
According to MZK, traffic is significantly slowing down in these locations, which directly affects the punctuality of services. The company also emphasizes that, as a carrier, it has no influence over the road situation or the resulting traffic jams.
MZK Bolesławiec:
We monitor the situation on an ongoing basis and, where possible, try to limit the effects of the delays; however, under the current conditions, we are unable to eliminate them completely. We ask passengers for their understanding and thank them for their patience.
The carrier assures that the situation is being monitored continuously and that organizational measures are intended to minimize the effects of the disruptions on passengers.