Renovation of one of the two bridges over the Bóbr River in Bolesławiec is under way. Vehicle traffic continues to be controlled by traffic lights. (The traffic lane from which work on the structure began is also being renovated.)
We also looked at the construction of the Żołnierzy Wyklętych Street section. Progress is visible. The sidewalks are almost finished. The road is being prepared for the laying of the top layer. It can be assumed that soon the residents of the housing estate will be able to use a direct connection to Gdańska Street.