Polarna Street (leading to Primary School No. 7) will be surfaced with concrete paving blocks (covering more than 900 square metres).

The car park, with a similar area, will have the same surface. Street lamps will be installed. The stormwater drainage system is being replaced.

A roadway and pavement along the residential block have already been built on Polarna Street. This is another investment addressing residents’ expectations. It is being carried out as part of a local initiative.

UM Legnica/ii