The works include the construction of a 174.15-metre section of bicycle path along national road no. 94 – Wróblewskiego Street – to Bobrowa Street, at the intersection with an internal road situated along the Bóbr River. The designed bicycle path will be 2.50 metres wide and will follow the route of the existing pedestrian path.
The contractor is Przedsiębiorstwo Robót Drogowych from Bolesławiec. The city budget allocated PLN 23,774 for this purpose. The works will continue until the end of June 2015.
iza