As part of the project, more than 11.8 km of gravity sewer network, 3.5 km of pressurized sewer network and more than 1.2 km of sewer connections to residential buildings were constructed. The project resulted in 4 wastewater pumping stations and 2 local wastewater pressure points, 2 compressor stations on the sewer network responsible for neutralizing odors resulting from the operation of the network, and 2 photovoltaic installations powering the water treatment plant in Krzyżowa and the wastewater treatment plant in Gromadka.
The investment also included the modernization of the water treatment plant in Krzyżowa and the restoration of asphalt and unpaved road surfaces.
The total value of the project amounted to PLN 8,136,383.51, of which PLN 5,415,835.92 was funding from the Regional Operational Programme of the Lower Silesian Voivodeship for 2014–2020.