The project involves reconstructing two sections of side roads (each 153 m long) from Kleeberga Street, together with parking spaces, an asphalt-concrete surface and sidewalks with concrete paving-block surfaces providing access to multi-family residential buildings and waste containers.
The works include, among other things, renovating the sidewalk along Kleeberga Street, reconstructing the road drainage system and the lighting line, including relocating lighting fixtures, as well as eliminating the conflict between the power line and the parking spaces.
UM Bolesławiec/ii
