Construction work on the road on Grabowa Street has been completed. The work included constructing the road’s bituminous surface, a kerbside drainage channel, reinforced individual driveways and access paths to properties, a stormwater drainage system with inlets, and lighting.

Grabowa Street is lit by three LED street lamps. The total cost of the project amounted to PLN 325,000.

Ulica Grabowa w BolesławcuUlica Grabowa w Bolesławcu • Photo author: Miasto Bolesławiec