The bridge in Lwówek Śląski, located on Betleja Street along provincial road no. 364, has been closed. It is scheduled for renovation, which is expected to last about a year.

Work on the construction of the temporary bridge began at the end of June. The lwowecki.info:

The steel structure was placed over the river just several dozen metres from the old bridge. The temporary bridge connected Rybna Street with the PKS depot.

The bridge officially opened on 17 July. Piotr Tyniec from the Lower Silesian Roads and Railway Service said:

The temporary bridge was built, firstly, so that residents would not face traffic difficulties and, secondly, so that transit traffic could continue using the provincial road.

Details at lwowecki.info.

Do you travel this way? What do you think of this detour? Join the discussion.